Flexential - Atlanta/Norcross (ATL1/2)
Flexential - Atlanta/Norcross (ATL1/2) is an operational data center operated by Flexential in Norcross, United States. Our footprint estimate of its power is about 4.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Flexential |
| Facility power | 4.9 MW (range 2.4 MW to 7.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,076 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Flexential Atlanta - Norcross |
| Address | 2775 Northwoods Parkway NW |
| Coordinates | 33.95476, -84.19864 |
| Website | flexential.com |
Power and grid
| Nearest high-voltage substation | Norcross Substation #2 MEAG, 115 kV, 1.7 km away (MEAG) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 1.8 km away |
| HV substations within 10 km | 31 |
| Utility | Georgia Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 20.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.3 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.4 °C (2001 to 2025) |
| Cooling degree days | 1,053 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.5 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Flexential - Atlanta/Norcross (ATL1/2) use?
We estimate the facility power at about 4.9 MW. Estimate from building footprint, low confidence.
How close is Flexential - Atlanta/Norcross (ATL1/2) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Norcross Substation #2 MEAG (115 kV), about 1.7 km away. The local utility is Georgia Power Co, in the SOCO balancing area.
How clean is the power for Flexential - Atlanta/Norcross (ATL1/2)?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates Flexential - Atlanta/Norcross (ATL1/2)?
Flexential.
Data centers near Norcross
- Lincoln Rackhouse Atlanta 12.2 km
- Ascent - Atlanta Data Center 13.3 km · 7.8 MW
- Data center in Alpharetta 13.7 km · 2.8 MW
- 365 Data Centers Alpharetta (GA1) 13.9 km
- Cox Data Center 14.4 km · 13 MW
- T5 Data Center 14.8 km · 12 MW
- Serverfarm ATL1 Atlanta 15.4 km
- Hewlett-Packard 15.5 km · 18 MW
More Flexential data centers
- Douglasville 2 United States
- Flexential - Atlanta/Douglasville (ATL5) United States
- Flexential - Portland/Hillsboro 3 (PDX03) United States
- Flexential - Dallas/Plano (DFW01) United States
- Flexential - Denver/Englewood (DEN11) United States
- Flexential - Portland/Hillsboro 2 (PDX02) United States
- Flexential Dallas - Richardson United States
- Flexential - Portland/Hillsboro 4 (PDX04) United States
Sources