Data Center Directory

Douglasville 2

Douglasville 2 is an operational data center operated by Flexential in Douglasville, United States. Our footprint estimate of its power is about 65 MW.

Key facts

StatusOperational
OperatorFlexential
Facility power65 MW (range 32 MW to 103 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 53,752 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 28,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressNorth River Road 1750, 30122, Douglasville
Coordinates33.73070, -84.61124
Websiteflexential.com/data-centers/ga/atlanta/douglasville-2-data-center

Power and grid

UtilityGreystone Power Corporation (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 6.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.4 °C (2001 to 2025)
Cooling degree days1,093 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.51 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Douglasville 2 use?

We estimate the facility power at about 65 MW. Estimate from building footprint, low confidence.

How clean is the power for Douglasville 2?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates Douglasville 2?

Flexential.

Data centers near Douglasville

More Flexential data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.