Douglasville

Douglasville is an operational data center operated by Microsoft in Lithia Springs, United States. Our footprint estimate of its power is about 68 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power68 MW (range 34 MW to 109 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 56,815 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 29,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressNorth River Road 1601, 30122, Lithia Springs
Coordinates33.72995, -84.62334

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 400 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km22
UtilityGreystone Power Corporation (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 5.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.8 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.4 °C (2001 to 2025)
Cooling degree days1,093 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.51 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Douglasville use?

We estimate the facility power at about 68 MW. Estimate from building footprint, low confidence.

What chips does Douglasville use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Douglasville to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 400 m away. The local utility is Greystone Power Corporation, in the SOCO balancing area.

How clean is the power for Douglasville?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates Douglasville?

Microsoft.

Data centers near Lithia Springs

More Microsoft data centers