T5 Data Centers data center in Lithia Springs
T5 Data Centers data center in Lithia Springs is a data center under construction operated by T5 Data Centers in Lithia Springs, United States. Our footprint estimate of its power is about 31 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | T5 Data Centers |
| Facility power | 31 MW (range 12 MW to 78 MW) Estimate from building footprint, low confidence. Footprint estimate: about 260,307 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Atlanta III |
| Address | Trae Lane 1546, 30122, Lithia Springs |
| Coordinates | 33.76064, -84.60523 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 27 |
| Utility | Greystone Power Corporation (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 7.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 7.0 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,020 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does T5 Data Centers data center in Lithia Springs use?
We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.
How close is T5 Data Centers data center in Lithia Springs to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1 km away. The local utility is Greystone Power Corporation, in the SOCO balancing area.
How clean is the power for T5 Data Centers data center in Lithia Springs?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates T5 Data Centers data center in Lithia Springs?
T5 Data Centers.
Data centers near Lithia Springs
- T5@Atlanta 313 m · 4.9 MW
- STACK Infrastructure data center in Lithia Springs 376 m · 19 MW
- The Keep 1.1 km · 36 MW
- Switch "The Keep" Data Centre Campus 1.4 km · 115 MW
- The Keep 1.8 km · 37 MW
- Amazon Web Services data center in Lithia Springs 2.0 km · 51 MW
- Google Datacenter - Douglas County 2.1 km · 38 MW
- Atlanta, GA 2.2 km · 9.5 MW
More T5 Data Centers data centers
- T5@Cleveland United States
- T5@Chicago United States
- T5@Colorado Springs United States
- T5@Charlotte United States
- T5@Atlanta United States
- T5@Augusta United States
- T5@Cincinnati United States
- T5@Cleveland United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.