T5@Cleveland
T5@Cleveland is an operational data center operated by T5 Data Centers in Lakewood, United States. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | T5 Data Centers |
| Facility power | 15 MW (range 5.9 MW to 37 MW) Estimate from building footprint, low confidence. Footprint estimate: about 122,662 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.44306, -81.80345 |
| Website | t5datacenters.com/wp-content/uploads/2020/08/T5-Cleveland-Onesheet-2020.pdf |
Power and grid
| Nearest high-voltage substation | Plain Dealer Brooklyn Substation, 138 kV, 3.4 km away (Illuminating Comapny) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Fox Substation, 345 kV, 4.5 km away |
| HV substations within 10 km | 23 |
| Utility | City Of Cleveland (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | East Ohio Gas Co, intrastate pipeline, 4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 771 MW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.4 °C (2001 to 2025) |
| Cooling degree days | 411 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.63 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does T5@Cleveland use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
How close is T5@Cleveland to the power grid?
The nearest high-voltage substation in OpenStreetMap is Plain Dealer Brooklyn Substation (138 kV), about 3.4 km away. The local utility is City Of Cleveland, in the PJM balancing area.
How clean is the power for T5@Cleveland?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates T5@Cleveland?
T5 Data Centers.
Data centers near Lakewood
- T5@Cleveland 335 m
- Bluebird Fiber Parma Data Center 4.4 km
- Tech Mahindra Cleveland 11.0 km
- Cogent Cleveland 2 11.7 km
- DataBank Cleveland (CLE1) 11.8 km
- Fusion - Cleveland 12.1 km
- Zayo Cleveland - 1525 Rockwell Ave 12.2 km · 81 MW
- Lumen Cleveland 14.0 km · 3.2 MW
More T5 Data Centers data centers
- T5 Data Centers data center in Lithia Springs United States
- T5@Chicago United States
- T5@Colorado Springs United States
- T5@Charlotte United States
- T5@Atlanta United States
- T5@Augusta United States
- T5@Cincinnati United States
- T5@Cleveland United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.