T5@Cleveland

T5@Cleveland is an operational data center operated by T5 Data Centers in Lakewood, United States. Our footprint estimate of its power is about 15 MW.

Key facts

StatusOperational
OperatorT5 Data Centers
Facility power15 MW (range 5.9 MW to 37 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 122,662 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 6,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.44306, -81.80345
Websitet5datacenters.com/wp-content/uploads/2020/08/T5-Cleveland-Onesheet-2020.pdf

Power and grid

Nearest high-voltage substationPlain Dealer Brooklyn Substation, 138 kV, 3.4 km away (Illuminating Comapny)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationFox Substation, 345 kV, 4.5 km away
HV substations within 10 km23
UtilityCity Of Cleveland (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineEast Ohio Gas Co, intrastate pipeline, 4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km771 MW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.4 °C (2001 to 2025)
Cooling degree days411 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.63 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does T5@Cleveland use?

We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.

How close is T5@Cleveland to the power grid?

The nearest high-voltage substation in OpenStreetMap is Plain Dealer Brooklyn Substation (138 kV), about 3.4 km away. The local utility is City Of Cleveland, in the PJM balancing area.

How clean is the power for T5@Cleveland?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates T5@Cleveland?

T5 Data Centers.