DataBank Cleveland (CLE1)
DataBank Cleveland (CLE1) is an operational data center operated by DataBank in Cleveland, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | DataBank |
| Networks | 3 networks PeeringDB. |
| Also known as | BlueBridge Networks | Downtown Cleveland |
| Address | 1225 Euclid Avenue |
| Coordinates | 41.50102, -81.68410 |
| Website | databank.com/data-centers/cleveland |
Power and grid
| Utility | City Of Cleveland (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | East Ohio Gas Co, intrastate pipeline, 5.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.1 °C (2001 to 2025) |
| Cooling degree days | 404 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.63 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for DataBank Cleveland (CLE1)?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates DataBank Cleveland (CLE1)?
DataBank.
Data centers near Cleveland
- Fusion - Cleveland 312 m
- Zayo Cleveland - 1525 Rockwell Ave 572 m · 81 MW
- Tech Mahindra Cleveland 844 m
- Cogent Cleveland 2 2.0 km
- Lumen Cleveland 2.2 km · 3.2 MW
- T5@Cleveland 11.8 km · 15 MW
- T5@Cleveland 12.0 km
- Expedient Cleveland - 151 NEO 12.2 km
More DataBank data centers
- Databank Orangeburg (LGA3) United States
- DataBank Salt Lake City (SLC2) United States
- DataBank Ashburn (IAD1) United States
- DataBank Dallas (DFW3) United States
- DataBank Las Vegas (LAS1) United States
- DataBank Dallas (DFW4) United States
- DataBank Minneapolis (MSP3) United States
- DataBank Seattle (SEA2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.