Expedient Cleveland - 151 NEO is an operational data center operated by Expedient in Cleveland, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Expedient |
| Networks | 3 networks PeeringDB. |
| Also known as | Expedient Cleveland - 152 NEO |
| Address | 15166 NEO Parkway |
| Coordinates | 41.42823, -81.57395 |
| Website | expedient.com/data-centers |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 1.4 km away (Cleveland Public Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Inland Substation, 345 kV, 7.1 km away |
| HV substations within 10 km | 29 |
| Utility | City Of Cleveland (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | East Ohio Gas Co, intrastate pipeline, 1.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 245 MW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.1 °C (2001 to 2025) |
| Cooling degree days | 404 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.63 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Expedient Cleveland - 151 NEO to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 1.4 km away. The local utility is City Of Cleveland, in the PJM balancing area.
How clean is the power for Expedient Cleveland - 151 NEO?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Expedient Cleveland - 151 NEO?
Expedient.
Data centers near Cleveland
- ark data centers - Cleveland, OH 8.9 km · 3.6 MW
- Cogent Cleveland 2 10.5 km
- Lumen Cleveland 11.0 km · 3.2 MW
- Fusion - Cleveland 12.1 km
- DataBank Cleveland (CLE1) 12.2 km
- BlueBridge Networks | Mayfield Heights Data Center 12.4 km
- Tech Mahindra Cleveland 12.6 km
- Zayo Cleveland - 1525 Rockwell Ave 12.6 km · 81 MW
More Expedient data centers
- Expedient Pittsburgh - Green Tree United States
- Expedient Baltimore - Owings Mills United States
- Expedient Boston United States
- Expedient Columbus - Dublin United States
- Expedient Columbus - Upper Arlington United States
- Expedient Indianapolis United States
- Expedient Memphis United States
- Expedient Pittsburgh - Nova Place United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.