Data Center Directory

Expedient Cleveland - 151 NEO

Expedient Cleveland - 151 NEO is an operational data center operated by Expedient in Cleveland, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorExpedient
Networks3 networks
PeeringDB.
Also known asExpedient Cleveland - 152 NEO
Address15166 NEO Parkway
Coordinates41.42823, -81.57395
Websiteexpedient.com/data-centers

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 1.4 km away (Cleveland Public Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationInland Substation, 345 kV, 7.1 km away
HV substations within 10 km29
UtilityCity Of Cleveland (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineEast Ohio Gas Co, intrastate pipeline, 1.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km245 MW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.1 °C (2001 to 2025)
Cooling degree days404 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.63 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Expedient Cleveland - 151 NEO to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 1.4 km away. The local utility is City Of Cleveland, in the PJM balancing area.

How clean is the power for Expedient Cleveland - 151 NEO?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates Expedient Cleveland - 151 NEO?

Expedient.

Data centers near Cleveland

More Expedient data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.