ark data centers - Cleveland, OH is an operational data center operated by ark data centers in Independence, United States. Our footprint estimate of its power is about 3.6 MW.

Key facts

StatusOperational
Operatorark data centers
Facility power3.6 MW (range 1.8 MW to 5.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,960 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asInvolta Independence
Address7300 E Pleasant Valley Rd
Coordinates41.36116, -81.63254
Websitearkdna.com

Power and grid

Nearest high-voltage substationImperial/Pleasant Valley Substation, 138 kV, 1.5 km away (The Illuminating Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationJuniper Substation, 345 kV, 5.1 km away
HV substations within 10 km14
UtilityCity Of Cleveland (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineEast Ohio Gas Co, intrastate pipeline, 800 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km214 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.1 °C (2001 to 2025)
Cooling degree days404 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.63 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does ark data centers - Cleveland, OH use?

We estimate the facility power at about 3.6 MW. Estimate from building footprint, low confidence.

How close is ark data centers - Cleveland, OH to the power grid?

The nearest high-voltage substation in OpenStreetMap is Imperial/Pleasant Valley Substation (138 kV), about 1.5 km away. The local utility is City Of Cleveland, in the PJM balancing area.

How clean is the power for ark data centers - Cleveland, OH?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates ark data centers - Cleveland, OH?

ark data centers.

Data centers near Independence

More ark data centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.