Cogent Cleveland 2
Cogent Cleveland 2 is an operational data center operated by Cogent Communications in Cleveland, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cogent Communications |
| Networks | 1 networks PeeringDB. |
| Address | 2650 Rockefeller Avenue |
| Coordinates | 41.48477, -81.67477 |
| Website | cogentco.com/en/cogent-cleveland |
Power and grid
| Utility | City Of Cleveland (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | East Ohio Gas Co, intrastate pipeline, 3.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.1 °C (2001 to 2025) |
| Cooling degree days | 404 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.63 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Cogent Cleveland 2?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Cogent Cleveland 2?
Cogent Communications.
Data centers near Cleveland
- Fusion - Cleveland 1.9 km
- DataBank Cleveland (CLE1) 2.0 km
- Tech Mahindra Cleveland 2.1 km
- Zayo Cleveland - 1525 Rockwell Ave 2.5 km · 81 MW
- Lumen Cleveland 2.7 km · 3.2 MW
- Expedient Cleveland - 151 NEO 10.5 km
- T5@Cleveland 11.7 km · 15 MW
- T5@Cleveland 11.7 km
More Cogent Communications data centers
- Cogent Elkridge United States
- Cogent Data Center United States
- Cogent Dijon France
- Cogent Toulouse France
- Cogent Tours France
- Cogent Lille France
- Cogent Rouen France
- Omaha Switch United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.