Zayo Cleveland - 1525 Rockwell Ave
Zayo Cleveland - 1525 Rockwell Ave is an operational data center operated by Zayo in Cleveland, United States. Our footprint estimate of its power is about 81 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Zayo |
| Facility power | 81 MW (range 41 MW to 130 MW) Estimate from building footprint, low confidence. Footprint estimate: about 16,953 m² building outline x 4 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 35,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 21 networks, 5 internet exchanges PeeringDB. |
| Also known as | H5 Data Centers Cleveland · H5 Data Center |
| Address | 1525 Rockwell Ave |
| Coordinates | 41.50617, -81.68395 |
| Website | databank.com |
Power and grid
| Nearest high-voltage substation | Hamilton Substation, 138 kV, 300 m away (Illuminating Company;Cleveland Public Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Inland Substation, 345 kV, 5.7 km away |
| HV substations within 10 km | 35 |
| Utility | City Of Cleveland (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | East Ohio Gas Co, intrastate pipeline, 5.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 792 MW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.1 °C (2001 to 2025) |
| Cooling degree days | 404 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.63 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Zayo Cleveland - 1525 Rockwell Ave use?
We estimate the facility power at about 81 MW. Estimate from building footprint, low confidence.
How close is Zayo Cleveland - 1525 Rockwell Ave to the power grid?
The nearest high-voltage substation in OpenStreetMap is Hamilton Substation (138 kV), about 300 m away. The local utility is City Of Cleveland, in the PJM balancing area.
How clean is the power for Zayo Cleveland - 1525 Rockwell Ave?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Zayo Cleveland - 1525 Rockwell Ave?
Zayo.
Data centers near Cleveland
- DataBank Cleveland (CLE1) 572 m
- Fusion - Cleveland 576 m
- Tech Mahindra Cleveland 1.2 km
- Lumen Cleveland 2.2 km · 3.2 MW
- Cogent Cleveland 2 2.5 km
- T5@Cleveland 12.2 km · 15 MW
- T5@Cleveland 12.3 km
- Expedient Cleveland - 151 NEO 12.6 km
More Zayo data centers
- 10 Rue des Frères Peuge France
- NeoCenter Paris France
- Zayo Amsterdam Netherlands
- Zayo Baltimore - 111 Market Pl United States
- Zayo Minneapolis - 10300 6th Ave N United States
- Zayo Nashville - 209 10th Ave. S United States
- Zayo Networks United States
- Zayo Pittsburgh - 2500 Allegheny Center Mall United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.