Tech Mahindra Cleveland
Tech Mahindra Cleveland is an operational data center operated by Tech Mahindra in Cleveland, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Tech Mahindra |
| Networks | 1 networks, 1 internet exchanges PeeringDB. |
| Address | Higbee Bldg. |
| Coordinates | 41.49786, -81.69332 |
| Website | techmahindra.com/en-in/infrastructure-and-cloud-services/data-center-services |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 600 m away (Illuminating Comapny) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 6 km away |
| HV substations within 10 km | 35 |
| Utility | City Of Cleveland (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | East Ohio Gas Co, intrastate pipeline, 4.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 813 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.1 °C (2001 to 2025) |
| Cooling degree days | 404 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.63 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Tech Mahindra Cleveland to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 600 m away. The local utility is City Of Cleveland, in the PJM balancing area.
How clean is the power for Tech Mahindra Cleveland?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Tech Mahindra Cleveland?
Tech Mahindra.
Data centers near Cleveland
- DataBank Cleveland (CLE1) 844 m
- Fusion - Cleveland 1.2 km
- Zayo Cleveland - 1525 Rockwell Ave 1.2 km · 81 MW
- Cogent Cleveland 2 2.1 km
- Lumen Cleveland 3.1 km · 3.2 MW
- T5@Cleveland 11.0 km · 15 MW
- T5@Cleveland 11.1 km