T5@Cleveland is an operational data center operated by T5 Data Centers in Cleveland, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorT5 Data Centers
Address4150 W 150th Street
Coordinates41.44012, -81.80254
Websitet5datacenters.com/locations/cleveland-colocation-data-center

Power and grid

UtilityCity Of Cleveland (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineEast Ohio Gas Co, intrastate pipeline, 3.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.4 °C (2001 to 2025)
Cooling degree days411 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.63 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for T5@Cleveland?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates T5@Cleveland?

T5 Data Centers.

Data centers near Cleveland

More T5 Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.