T5@Atlanta is a data center under construction operated by T5 Data Centers in Lithia Springs, United States. Our footprint estimate of its power is about 4.9 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | T5 Data Centers |
| Facility power | 4.9 MW (range 2 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 40,831 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Atlanta III |
| Address | 1456 Trae Lane |
| Coordinates | 33.76344, -84.60497 |
| Website | t5datacenters.com/locations/t5-atlanta |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 900 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 27 |
| Utility | Greystone Power Corporation (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 7.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 7.0 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,020 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does T5@Atlanta use?
We estimate the facility power at about 4.9 MW. Estimate from building footprint, low confidence.
How close is T5@Atlanta to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 900 m away. The local utility is Greystone Power Corporation, in the SOCO balancing area.
How clean is the power for T5@Atlanta?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates T5@Atlanta?
T5 Data Centers.
Data centers near Lithia Springs
- T5 Data Centers data center in Lithia Springs 313 m · 31 MW
- STACK Infrastructure data center in Lithia Springs 350 m · 19 MW
- The Keep 1.1 km · 36 MW
- Switch "The Keep" Data Centre Campus 1.4 km · 115 MW
- The Keep 1.9 km · 37 MW
- Google Datacenter - Douglas County 2.3 km · 38 MW
- Amazon Web Services data center in Lithia Springs 2.4 km · 51 MW
- Atlanta, GA 2.5 km · 9.5 MW
More T5 Data Centers data centers
- T5 Data Centers data center in Lithia Springs United States
- T5@Cleveland United States
- T5@Chicago United States
- T5@Colorado Springs United States
- T5@Charlotte United States
- T5@Augusta United States
- T5@Cincinnati United States
- T5@Cleveland United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.