Switch "The Keep" Data Centre Campus
Switch "The Keep" Data Centre Campus is an operational data center operated by Switch in Lithia Springs, United States. Our footprint estimate of its power is about 115 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Switch |
| Facility power | 115 MW (range 46 MW to 286 MW) Estimate from building footprint, low confidence. Footprint estimate: about 954,795 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 49,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | The Keep |
| Address | Switch Way 1, 30122, Lithia Springs |
| Coordinates | 33.75893, -84.59077 |
| Website | switch.com/atlanta |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 700 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 26 |
| Utility | Greystone Power Corporation (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,020 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Switch "The Keep" Data Centre Campus use?
We estimate the facility power at about 115 MW. Estimate from building footprint, low confidence.
How close is Switch "The Keep" Data Centre Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 700 m away. The local utility is Greystone Power Corporation, in the SOCO balancing area.
How clean is the power for Switch "The Keep" Data Centre Campus?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates Switch "The Keep" Data Centre Campus?
Switch.
Data centers near Lithia Springs
- The Keep 445 m · 36 MW
- The Keep 542 m · 37 MW
- Google Datacenter - Douglas County 1.1 km · 38 MW
- STACK Infrastructure data center in Lithia Springs 1.1 km · 19 MW
- T5 Data Centers data center in Lithia Springs 1.4 km · 31 MW
- T5@Atlanta 1.4 km · 4.9 MW
- Digital Realty Atlanta ATL11 1.7 km · 30 MW
- Centersquare Atlanta (ATL1-A/B/C) 1.8 km · 36 MW
More Switch data centers
- Switch Las Vegas 15 United States
- Tahoe Reno 1 United States
- Tahoe Reno 5 United States
- The Keep United States
- The Keep United States
- Switch12 United States
- Tahoe Reno 3 United States
- Switch Las Vegas United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.