Switch Las Vegas
Switch Las Vegas is an operational data center operated by Switch in Las Vegas, United States. Our footprint estimate of its power is about 29 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Switch |
| Facility power | 29 MW (range 15 MW to 47 MW) Estimate from building footprint, low confidence. Footprint estimate: about 24,237 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 46 networks, 1 internet exchanges PeeringDB. |
| Also known as | Switch Las Vegas 7 |
| Address | 7135 S Decatur Boulevard |
| Coordinates | 36.05991, -115.21019 |
| Website | switchnap.com |
Power and grid
| Utility | Colorado River Comm Of Nevada (state) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | NEVP |
| Nearest gas pipeline | Southwest Gas Corp, intrastate pipeline, 5.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 326 g CO₂ per kWh (Nevada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, solar 33.6%, other renewables 8.2%, coal 5.5%, hydro 4%. Clean power: 46.7% |
| Industrial power price | USD 0.102 per kWh (Nevada, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 19.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 47.6 °C (2001 to 2025) |
| Cooling degree days | 1,870 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.64 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (Nevada) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Switch Las Vegas use?
We estimate the facility power at about 29 MW. Estimate from building footprint, low confidence.
How clean is the power for Switch Las Vegas?
The grid in Nevada emits about 326 g CO₂ per kWh (2025). Largest sources: gas 48.3%, solar 33.6%, other renewables 8.2%.
Who operates Switch Las Vegas?
Switch.
Data centers near Las Vegas
- Switch Las Vegas 12 214 m · 5.5 MW
- Switch Edge 1 326 m · 2.6 MW
- Switch12 345 m · 33 MW
- Switch Las Vegas 8 432 m · 26 MW
- Switch Las Vegas 9 968 m · 29 MW
- Switch Las Vegas 16 1.0 km · 6.9 MW
- Switch Las Vegas 15 1.1 km · 55 MW
- Switch Las Vegas 10 1.3 km · 20 MW
More Switch data centers
- Switch "The Keep" Data Centre Campus United States
- Switch Las Vegas 15 United States
- Tahoe Reno 1 United States
- Tahoe Reno 5 United States
- The Keep United States
- The Keep United States
- Switch12 United States
- Tahoe Reno 3 United States