Switch Las Vegas 10

Switch Las Vegas 10 is an operational data center in Enterprise, United States. Our footprint estimate of its power is about 20 MW.

Key facts

StatusOperational
Facility power20 MW (range 9.9 MW to 32 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 16,557 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates36.05559, -115.22306

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 500 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 4 km away
HV substations within 10 km26
UtilityColorado River Comm Of Nevada (state)
Electric retail service territory (HIFLD, US government).
Balancing authorityNEVP
Nearest gas pipelineSouthwest Gas Corp, intrastate pipeline, 5.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km8.6 GW in 46 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity326 g CO₂ per kWh (Nevada, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, solar 33.6%, other renewables 8.2%, coal 5.5%, hydro 4%. Clean power: 46.7%
Industrial power priceUSD 0.102 per kWh (Nevada, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature19.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature47.6 °C (2001 to 2025)
Cooling degree days1,870 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.64 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (Nevada)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Switch Las Vegas 10 use?

We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.

How close is Switch Las Vegas 10 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 500 m away. The local utility is Colorado River Comm Of Nevada, in the NEVP balancing area.

How clean is the power for Switch Las Vegas 10?

The grid in Nevada emits about 326 g CO₂ per kWh (2025). Largest sources: gas 48.3%, solar 33.6%, other renewables 8.2%.