Switch Edge 1 is an operational data center in Enterprise, United States. Our footprint estimate of its power is about 2.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.6 MW (range 1.3 MW to 4.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,152 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 36.05913, -115.21369 |
Power and grid
| Utility | Colorado River Comm Of Nevada (state) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | NEVP |
| Nearest gas pipeline | Southwest Gas Corp, intrastate pipeline, 5.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 326 g CO₂ per kWh (Nevada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, solar 33.6%, other renewables 8.2%, coal 5.5%, hydro 4%. Clean power: 46.7% |
| Industrial power price | USD 0.102 per kWh (Nevada, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 19.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 47.6 °C (2001 to 2025) |
| Cooling degree days | 1,870 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.64 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (Nevada) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Switch Edge 1 use?
We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.
How clean is the power for Switch Edge 1?
The grid in Nevada emits about 326 g CO₂ per kWh (2025). Largest sources: gas 48.3%, solar 33.6%, other renewables 8.2%.
Data centers near Enterprise
- Switch Las Vegas 8 153 m · 26 MW
- Switch12 292 m · 33 MW
- Switch Las Vegas 326 m · 29 MW
- Switch Las Vegas 12 328 m · 5.5 MW
- Switch Las Vegas 9 656 m · 29 MW
- Switch Las Vegas 15 860 m · 55 MW
- Switch Las Vegas 16 879 m · 6.9 MW
- Switch Las Vegas 10 930 m · 20 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.