Tahoe Reno 1
Tahoe Reno 1 is an operational data center operated by Switch in McCarran, United States. Our footprint estimate of its power is about 55 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Switch |
| Facility power | 55 MW (range 27 MW to 88 MW) Estimate from building footprint, low confidence. Footprint estimate: about 45,615 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 24,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Superloop Circle 1, 89434, McCarran |
| Coordinates | 39.51407, -119.47551 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 120 kV, 500 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 5.9 km away |
| HV substations within 10 km | 20 |
| Utility | Sierra Pacific Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | NEVP |
| Nearest gas pipeline | Paiute Pipeline Co, intrastate pipeline, 3.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 326 g CO₂ per kWh (Nevada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, solar 33.6%, other renewables 8.2%, coal 5.5%, hydro 4%. Clean power: 46.7% |
| Industrial power price | USD 0.102 per kWh (Nevada, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.2 °C (2001 to 2025) |
| Cooling degree days | 557 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.23 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | High (40-80%) (Nevada) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Tahoe Reno 1 use?
We estimate the facility power at about 55 MW. Estimate from building footprint, low confidence.
How close is Tahoe Reno 1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (120 kV), about 500 m away. The local utility is Sierra Pacific Power Co, in the NEVP balancing area.
How clean is the power for Tahoe Reno 1?
The grid in Nevada emits about 326 g CO₂ per kWh (2025). Largest sources: gas 48.3%, solar 33.6%, other renewables 8.2%.
Who operates Tahoe Reno 1?
Switch.
Data centers near McCarran
- Switch Tahoe Reno 406 m
- Switch - The Citadel 531 m · 204 MW
- Tahoe Reno 3 726 m · 33 MW
- Tahoe Reno 2 801 m · 26 MW
- Tahoe Reno 5 939 m · 37 MW
- EdgeCore Reno 1 1.3 km
- Data center in Spanish Springs 8.2 km · 15 MW
- Apple Reno Data Center 8.2 km · 250 MW
More Switch data centers
- Switch "The Keep" Data Centre Campus United States
- Switch Las Vegas 15 United States
- Tahoe Reno 5 United States
- The Keep United States
- The Keep United States
- Switch12 United States
- Tahoe Reno 3 United States
- Switch Las Vegas United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.