Switch - The Citadel
Switch - The Citadel is an operational data center in Fernley, United States. Our footprint estimate of its power is about 204 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 204 MW (range 82 MW to 510 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,701,096 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 87,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 39.51024, -119.47922 |
| Website | switch.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Switch - The Citadel use?
We estimate the facility power at about 204 MW. Estimate from building footprint, low confidence.
Data centers near Fernley
- Tahoe Reno 3 378 m · 33 MW
- Tahoe Reno 5 420 m · 37 MW
- Tahoe Reno 1 531 m · 55 MW
- Tahoe Reno 2 629 m · 26 MW
- Switch Tahoe Reno 913 m
- EdgeCore Reno 1 1.6 km
- Data center in Spanish Springs 8.3 km · 15 MW
- Apple Reno Data Center 8.3 km · 250 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.