Data Center Directory

Switch - The Citadel

Switch - The Citadel is an operational data center in Fernley, United States. Our footprint estimate of its power is about 204 MW.

Key facts

StatusOperational
Facility power204 MW (range 82 MW to 510 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,701,096 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 87,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates39.51024, -119.47922
Websiteswitch.com

Satellite view

Questions

How much power does Switch - The Citadel use?

We estimate the facility power at about 204 MW. Estimate from building footprint, low confidence.

Data centers near Fernley

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.