EdgeCore Reno 1
EdgeCore Reno 1 is an operational data center operated by EdgeCore Digital Infrastructure in McCarran, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeCore Digital Infrastructure |
| Address | 3000 USA Parkway |
| Coordinates | 39.52441, -119.48181 |
| Website | edgecore.com/locations/reno-data-center-campus |
Power and grid
| Utility | Sierra Pacific Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | NEVP |
| Nearest gas pipeline | Paiute Pipeline Co, intrastate pipeline, 2.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 326 g CO₂ per kWh (Nevada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, solar 33.6%, other renewables 8.2%, coal 5.5%, hydro 4%. Clean power: 46.7% |
| Industrial power price | USD 0.102 per kWh (Nevada, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.2 °C (2001 to 2025) |
| Cooling degree days | 557 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.23 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | High (40-80%) (Nevada) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for EdgeCore Reno 1?
The grid in Nevada emits about 326 g CO₂ per kWh (2025). Largest sources: gas 48.3%, solar 33.6%, other renewables 8.2%.
Who operates EdgeCore Reno 1?
EdgeCore Digital Infrastructure.
Data centers near McCarran
- Tahoe Reno 2 1.2 km · 26 MW
- Tahoe Reno 1 1.3 km · 55 MW
- Switch Tahoe Reno 1.3 km
- Tahoe Reno 3 1.4 km · 33 MW
- Switch - The Citadel 1.6 km · 204 MW
- Tahoe Reno 5 1.8 km · 37 MW
- Data center in Spanish Springs 6.9 km · 15 MW
- Apple Reno Data Center 7.0 km · 250 MW
More EdgeCore Digital Infrastructure data centers
- EdgeCore VA1 United States
- EdgeCore Silicon Valley United States
- EdgeCore Phoenix United States
- EdgeCore VA2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.