T5@Charlotte
T5@Charlotte is an operational data center operated by T5 Data Centers in Kings Mountain, United States. Our footprint estimate of its power is about 5.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | T5 Data Centers |
| Facility power | 5.8 MW (range 2.3 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 48,230 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | T5 Charlotte Campus |
| Address | 131 Riverside Court |
| Coordinates | 35.25045, -81.39510 |
| Website | t5datacenters.com/locations/t5-charlotte |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 100 kV, 500 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 6.4 km away |
| HV substations within 10 km | 11 |
| Utility | Rutherford Elec Member Corp (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DUK |
| Nearest gas pipeline | Public Service Co of NC, intrastate pipeline, 4.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 12 GW in 79 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.2 °C (2001 to 2025) |
| Cooling degree days | 931 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.44 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does T5@Charlotte use?
We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.
How close is T5@Charlotte to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (100 kV), about 500 m away. The local utility is Rutherford Elec Member Corp, in the DUK balancing area.
How clean is the power for T5@Charlotte?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Who operates T5@Charlotte?
T5 Data Centers.
Data centers near Kings Mountain
- QTS Charlotte (CTL1) 35.6 km
- Data center in Newton 39.4 km · 53 MW
- Meta 39.4 km · 71 MW
- Apple - Maiden Data Center 39.5 km · 87 MW
- Data center in Newton 39.6 km · 58 MW
- Meta Forest City Data Center 39.6 km · 64 MW
- CLT2 42.0 km
- DC74-CLT1 42.1 km
More T5 Data Centers data centers
- T5 Data Centers data center in Lithia Springs United States
- T5@Cleveland United States
- T5@Chicago United States
- T5@Colorado Springs United States
- T5@Atlanta United States
- T5@Augusta United States
- T5@Cincinnati United States
- T5@Cleveland United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.