Data center in Newton
Data center in Newton is an operational data center in Newton, United States. Our footprint estimate of its power is about 53 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 53 MW (range 27 MW to 85 MW) Estimate from building footprint, low confidence. Footprint estimate: about 44,390 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 23,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.58705, -81.26028 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 100 kV, 600 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 1.9 km away |
| HV substations within 10 km | 18 |
| Utility | Rutherford Elec Member Corp (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DUK |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 6.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 9.4 GW in 74 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.2 °C (2001 to 2025) |
| Cooling degree days | 931 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.44 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Newton use?
We estimate the facility power at about 53 MW. Estimate from building footprint, low confidence.
How close is Data center in Newton to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (100 kV), about 600 m away. The local utility is Rutherford Elec Member Corp, in the DUK balancing area.
How clean is the power for Data center in Newton?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Data centers near Newton
- Apple - Maiden Data Center 264 m · 87 MW
- Data center in Newton 537 m · 58 MW
- T5@Charlotte 39.4 km · 5.8 MW
- Google Project Cardinal 42.7 km · 40 MW
- Google Lenoir Data Center 43.3 km · 17 MW
- 801 Main Street - Lenoir 45.2 km
- CLT2 52.6 km
- DC74-CLT1 52.6 km