Google Project Cardinal
Google Project Cardinal is an operational data center operated by Google in Lenoir, United States. Our footprint estimate of its power is about 40 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 40 MW (range 16 MW to 101 MW) Estimate from building footprint, low confidence. Footprint estimate: about 335,547 m² site outline x 0.12 kW per m² of land. |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 17,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.89290, -81.54614 |
Power and grid
| Utility | Blue Ridge Elec Member Corp (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | DUK |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 747 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Project Cardinal use?
We estimate the facility power at about 40 MW. Estimate from building footprint, low confidence.
What chips does Google Project Cardinal use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How clean is the power for Google Project Cardinal?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Who operates Google Project Cardinal?
Google.
Data centers near Lenoir
- Google Lenoir Data Center 640 m · 17 MW
- 801 Main Street - Lenoir 3.3 km
- Data center in Newton 42.2 km · 58 MW
- Apple - Maiden Data Center 42.4 km · 87 MW
- Data center in Newton 42.7 km · 53 MW
- Meta Forest City Data Center 68.9 km · 64 MW
- Meta 69.0 km · 71 MW
- T5@Charlotte 72.7 km · 5.8 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.