Google Pryor (North)
Google Pryor (North) is an operational AI data center operated by Google in Pryor, United States. Its power is about 442 MW. Epoch AI estimates about 637,000 H100-equivalent AI chips (TPU v5p, TPU v5e).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Users | Google DeepMind (speculative) |
| Facility power | 442 MW Reported (Epoch AI or owner data) |
| IT power | 368 MW |
| AI compute | 637,000 H100-equivalents |
| AI chips | TPU v5p, TPU v5e Reported (Epoch AI or owner data) |
| Chip count | 32,768 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 200,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 13.9 billion Epoch AI estimate, 2025 USD. |
| Address | 4581 Webb St, Pryor, OK 74361 |
| Coordinates | 36.24117, -95.33005 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2019-08-01 | 0 | 0 | Land clearing begins for Building 1. |
| 2024-07-19 | 63 MW | 26,000 | Building 1 is operational, based on default roof-to-operational time. |
| 2025-01-28 | 63 MW | 26,000 | Building 2 is being retrofitted from a warehouse. The roof is being painted white, and cooling towers and a new substation are being built just south of the building (based on later imagery). |
| 2025-10-19 | 63 MW | 26,000 | The new substation for Building 2 looks mostly complete, half of the cooling towers are installed. The black patch in the top left of the building suggests that the new roof is not quite complete. |
| 2026-05-26 | 63 MW | 26,000 | Building 2 looks almost complete, but still appears to have three cooling towers missing. We therefore expect another 3 months until full operation. |
| 2026-09-06 | 442 MW | 637,000 | Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-07-19 | TPU v5p | 23,466 | Estimate |
| 2024-07-19 | TPU v5e | 77,886 | Estimate |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Google Oklahoma TPU v4 Pods | Google TPU v4 | 32,768 | 24 MW | 2022-05-12 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Pryor (North) use?
Public data puts the facility power at about 442 MW. Reported (Epoch AI or owner data).
What chips does Google Pryor (North) use?
Reported chips: TPU v5p, TPU v5e.
Who operates Google Pryor (North)?
Google. Reported users: Google DeepMind.
Data centers near Pryor
- Lake Region Technology & Communications 38.7 km
- TulsaConnect DC3 48.3 km
- TulsaConnect DC3 48.5 km
- TierPoint Tulsa-State Farm 48.6 km
- Data center in Tulsa 50.3 km · 0.7 MW
- Cherokee Data Center 52.1 km · 45 MW
- Jackson Technical Datacenter 59.5 km
- OneNet OSU Tulsa 59.6 km
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
- Google Cedar Rapids United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.