Google Columbus

Google Columbus is an operational data center that is still expanding, operated by Google in Columbus, United States. Its power is about 364 MW, growing to about 464 MW by 2027-07. Epoch AI estimates about 332,000 H100-equivalent AI chips (TPU v5e, TPU v5p, TPU v6e, TPU v7).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorGoogle
UsersGoogle DeepMind (speculative)
Facility power364 MW
Reported (Epoch AI or owner data)
IT power303 MW
Planned power464 MW by 2027-07-01
Epoch AI timeline projection.
AI compute332,000 H100-equivalents → 576,000 planned
AI chipsTPU v5e, TPU v5p, TPU v6e, TPU v7
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 170,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 11.5 billion → 14.6 billion planned
Epoch AI estimate, 2025 USD.
Address5076 S High St, Columbus, OH 43207
Coordinates39.86145, -83.00400

Build timeline

DatePowerH100eWhat the satellite images and filings show
2021-10-0100Land clearing begins on the eastern half of the site, for Buildings 1-2
2023-07-0100Building 2 foundation work begins. Building 1 generators seem complete, cooling towers still under construction.
2024-04-0178 MW33,000Building 1 operational. No visible construction and roads/parking complete around the building. Building 2 chillers are beginning construction. Foundation work begins for Building 3.
2025-03-01156 MW90,000Building 2 operational. Parking complete, no more visible construction.
2025-10-01260 MW211,000Building 3 operational. Surrounding roads finished, no more visible construction.
2026-02-21260 MW211,000Buildings 1-3 are visibly operational, with steam coming out of the cooling towers. Meanwhile Building 4 is extremely close to completion, with all backup generators complete with only 3 cooling towers missing their fans. ~1/2 the generators are installed for Building 5, and the roof is mostly complete (starting to install the final white layer, with the actual roof structure already complete).
2026-05-01364 MW332,000Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete.
2026-08-05364 MW332,000Confirmation that Building 4 is complete. Building 5 has progressed since February, with a complete roof, all backup generators in place, and five cooling towers in place.
2027-07-01 (projected)464 MW576,000Building 5 operational. The [transmission line construction notice](https://www.aeptransmission.com/ohio/docs/Hartman%20Farms%20Extension%20No.%202%20138%20kV%20Transmission%20Line%20Project%20Construction%20Notice.pdf) that expands site by 100 MW is assumed to be entirely for Building 5, and has an in-service date of July 1, 2027 (page 3). Estimate taken on the safe side based on completion times for Building 3-4 from when roof was complete.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-04-01TPU v5e147,878Estimate
2024-04-01TPU v5p7,425Estimate
2025-03-01TPU v6e41,245Estimate
2025-03-01TPU v5p28,246Estimate
2025-03-01TPU v5e193,949Estimate
2025-10-01TPU v6e172,060Estimate
2026-05-01TPU v6e204,638Estimate
2026-05-01TPU v738,886Estimate

Satellite view

Questions

How much power does Google Columbus use?

Public data puts the facility power at about 364 MW, with about 464 MW planned by 2027. Reported (Epoch AI or owner data).

What chips does Google Columbus use?

Reported chips: TPU v5e, TPU v5p, TPU v6e, TPU v7.

Who operates Google Columbus?

Google. Reported users: Google DeepMind.