Google New Albany
Google New Albany is an operational AI data center operated by Google in New Albany, United States. Its power is about 400 MW. Epoch AI estimates about 324,000 H100-equivalent AI chips (TPU v5e, TPU v5p, TPU v6e).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Users | Google DeepMind (speculative) |
| Facility power | 400 MW Reported (Epoch AI or owner data) |
| IT power | 333 MW |
| AI compute | 324,000 H100-equivalents |
| AI chips | TPU v5e, TPU v5p, TPU v6e Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 190,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 12.6 billion Epoch AI estimate, 2025 USD. |
| Address | 1101 Beech Rd SW, New Albany, OH 43054 |
| Coordinates | 40.07005, -82.75404 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2021-03-01 | 0 | 0 | Land clearing begins. |
| 2024-04-20 | 80 MW | 34,000 | Building 1 is operational. Based on ~7 months since roof being completed, and cooling towers being installed sometime within that period. Building 2 roof is complete. |
| 2024-09-13 | 173 MW | 73,000 | Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around the building. Building 3 roof is also complete. |
| 2025-06-01 | 267 MW | 168,000 | Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. Work is underway on Building 5 - some walls and a few backup generators are in place. |
| 2025-10-14 | 400 MW | 324,000 | Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup generators are in place. One cooling tower is partly built. |
| 2026-01-18 | 400 MW | 324,000 | Water vapor from cooling towers is present across Building 1-4, confirming their operation. Building 5 roof is still incomplete, but most backup generators and 5 cooling towers have been installed. |
| 2026-03-12 | 400 MW | 324,000 | Building 5 has more cooling towers installed but not complete, and the roof is almost complete. |
| 2026-05-18 | 400 MW | 324,000 | Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building. Based on that, we estimate 3 more months until operational. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-04-20 | TPU v5e | 151,829 | Estimate |
| 2024-04-20 | TPU v5p | 7,624 | Estimate |
| 2024-09-13 | TPU v5p | 50,653 | Estimate |
| 2024-09-13 | TPU v5e | 247,041 | Estimate |
| 2025-06-01 | TPU v6e | 94,843 | Estimate |
| 2025-06-01 | TPU v5p | 66,612 | Estimate |
| 2025-10-14 | TPU v6e | 262,731 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google New Albany use?
Public data puts the facility power at about 400 MW. Reported (Epoch AI or owner data).
What chips does Google New Albany use?
Reported chips: TPU v5e, TPU v5p, TPU v6e.
Who operates Google New Albany?
Google. Reported users: Google DeepMind.
Data centers near New Albany
- NAO 1/NAO 2 366 m · 120 MW
- Meta New Albany Data Center 737 m · 119 MW
- Quality Technology Services data center in New Albany 821 m · 27 MW
- NAO 5/NAO 6 1.1 km · 88 MW
- Meta LCO 3 Project 1.2 km · 174 MW
- Google NBY-1 1.3 km · 27 MW
- Data center in New Albany 1.4 km · 18 MW
- LCO 1 1.5 km · 44 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google Storey County United States
- Google Lincoln United States
- Google Cedar Rapids United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.