Google New Albany

Google New Albany is an operational AI data center operated by Google in New Albany, United States. Its power is about 400 MW. Epoch AI estimates about 324,000 H100-equivalent AI chips (TPU v5e, TPU v5p, TPU v6e).

Key facts

StatusOperational
OperatorGoogle
UsersGoogle DeepMind (speculative)
Facility power400 MW
Reported (Epoch AI or owner data)
IT power333 MW
AI compute324,000 H100-equivalents
AI chipsTPU v5e, TPU v5p, TPU v6e
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 190,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 12.6 billion
Epoch AI estimate, 2025 USD.
Address1101 Beech Rd SW, New Albany, OH 43054
Coordinates40.07005, -82.75404

Build timeline

DatePowerH100eWhat the satellite images and filings show
2021-03-0100Land clearing begins.
2024-04-2080 MW34,000Building 1 is operational. Based on ~7 months since roof being completed, and cooling towers being installed sometime within that period. Building 2 roof is complete.
2024-09-13173 MW73,000Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around the building. Building 3 roof is also complete.
2025-06-01267 MW168,000Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. Work is underway on Building 5 - some walls and a few backup generators are in place.
2025-10-14400 MW324,000Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup generators are in place. One cooling tower is partly built.
2026-01-18400 MW324,000Water vapor from cooling towers is present across Building 1-4, confirming their operation. Building 5 roof is still incomplete, but most backup generators and 5 cooling towers have been installed.
2026-03-12400 MW324,000Building 5 has more cooling towers installed but not complete, and the roof is almost complete.
2026-05-18400 MW324,000Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building. Based on that, we estimate 3 more months until operational.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-04-20TPU v5e151,829Estimate
2024-04-20TPU v5p7,624Estimate
2024-09-13TPU v5p50,653Estimate
2024-09-13TPU v5e247,041Estimate
2025-06-01TPU v6e94,843Estimate
2025-06-01TPU v5p66,612Estimate
2025-10-14TPU v6e262,731Estimate

Satellite view

Questions

How much power does Google New Albany use?

Public data puts the facility power at about 400 MW. Reported (Epoch AI or owner data).

What chips does Google New Albany use?

Reported chips: TPU v5e, TPU v5p, TPU v6e.

Who operates Google New Albany?

Google. Reported users: Google DeepMind.