Meta LCO 3 Project

Meta LCO 3 Project is a data center under construction operated by Meta in New Albany, United States. Our footprint estimate of its power is about 174 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorMeta
Facility power174 MW (range 69 MW to 434 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,447,046 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 74,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asLCO 2
Coordinates40.06495, -82.74189

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 300 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationBabbitt Substation, 345 kV, 1 km away
HV substations within 10 km25
UtilityLicking Rural Electric INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 6.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days532 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m5.1 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Meta LCO 3 Project use?

We estimate the facility power at about 174 MW. Estimate from building footprint, low confidence.

What chips does Meta LCO 3 Project use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

How close is Meta LCO 3 Project to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 300 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.

How clean is the power for Meta LCO 3 Project?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates Meta LCO 3 Project?

Meta.