Data Center Directory

QTS Cedar Rapids

QTS Cedar Rapids is a data center under construction operated by Meta in Fairfax, United States. No power figure is public for this site yet. Likely chips: B300.

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorMeta
UsersMeta (speculative)
Planned power1.6 GW by 2027-11-15
Epoch AI timeline projection.
AI chipsB300
Reported (Epoch AI or owner data)
Energy partnersAlliant Energy
Address6200 76th Ave SW, Fairfax, IA 52228
Coordinates41.90562, -91.75108

Build timeline

DatePowerH100eWhat the satellite images and filings show
2025-01-1700Land clearing begins for Building 1-3.
2025-10-2700Building 1 roof complete, with air-cooled chillers in place. Building 2 and 3 roofs are partly completed. Building 4 and 5 have a foundation.
2026-04-1600Based on satellite imagery, the Buildings 1-3 shells look complete. Buildings 4-6 are far along, with roofs largely in place, while the eastern Building 7 foundation is well underway. No buildings operational yet.
2026-05-0700Similar to April, Buildings 1-3 shells look complete. Buildings 4-6 are still far along, and the eastern Building 7 foundation is still underway.
2026-10-2300Buildings 1–3 look externally complete, with the air-cooled chillers fully installed, and surrounding yard work cleared. The many cars and trucks parked beside the buildings suggest commissioning is still underway, so we’re not counting any buildings operational yet. Buildings 4-6 shells appear complete, and Building 7 is nearly 90% roofed. This is based on high-resolution satellite imagery from this date.
2026-12-31 (projected)627 MW510,000Buildings 1-3 are operational. Based on the visible progress in the October satellite image, and the expected completion date reported by [local news](https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/): “A QTS spokesperson said in July [2025] that the first phase of the project was expected to be completed in late 2026."
2027-11-15 (projected)1.6 GW2.3 millionBuildings 4-7 are operational. Based on the expected completion date reported by [local news](https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/): “A QTS spokesperson said in July [2025] that [...] The second phase is expected to be completed in late 2027."

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-12-31B300202,048Estimate

Satellite view

Questions

What chips does QTS Cedar Rapids use?

Reported chips: B300.

Who operates QTS Cedar Rapids?

Meta. Reported users: Meta.

Data centers near Fairfax

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.