Data Center Directory

Meta Huntsville Data Center

Meta Huntsville Data Center is an operational data center operated by Meta in Meridianville, United States. Our footprint estimate of its power is about 344 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power344 MW (range 138 MW to 859 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,864,678 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 150,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMeta Huntsville Data center
Opened2019
Coordinates34.84790, -86.62550
Websitedatacenters.atmeta.com/wp-content/uploads/2023/03/Alabama-Huntsville.pdf

Satellite view

Questions

How much power does Meta Huntsville Data Center use?

We estimate the facility power at about 344 MW. Estimate from building footprint, low confidence.

What chips does Meta Huntsville Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

Who operates Meta Huntsville Data Center?

Meta.

Data centers near Meridianville

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.