George C. Wallace Alabama Supercomputer Center
George C. Wallace Alabama Supercomputer Center is an operational data center operated by Alabama Supercomputer Authority in Huntsville, United States. Our footprint estimate of its power is about 2.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Alabama Supercomputer Authority |
| Facility power | 2.6 MW (range 1.3 MW to 4.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,143 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Discovery Drive Northwest 686, 35806, Huntsville |
| Coordinates | 34.73654, -86.67310 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 161 kV, 4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Madison Substation, 500 kV, 15.3 km away |
| HV substations within 10 km | 8 |
| Utility | City Of Huntsville (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TVA |
| Nearest gas pipeline | Enbridge Pipelines (AlaTenn), interstate pipeline, 3.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.7 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 399 g CO₂ per kWh (Alabama, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.6%, nuclear 30%, coal 15.2%, hydro 5.8%, bioenergy 2.3%. Clean power: 39.1% |
| Industrial power price | USD 0.081 per kWh (Alabama, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 1,008 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Alabama) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does George C. Wallace Alabama Supercomputer Center use?
We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.
How close is George C. Wallace Alabama Supercomputer Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 4 km away. The local utility is City Of Huntsville, in the TVA balancing area.
How clean is the power for George C. Wallace Alabama Supercomputer Center?
The grid in Alabama emits about 399 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 30%, coal 15.2%.
Who operates George C. Wallace Alabama Supercomputer Center?
Alabama Supercomputer Authority.
Data centers near Huntsville
- Simple Helix 2.0 km · 2.9 MW
- DC BLOX HSV1 - DCBLOX Huntsville 3.3 km
- Peace Communications HSV1 8.3 km
- Meta Huntsville Data center 12.2 km · 106 MW
- Meta Huntsville Data center 12.6 km · 59 MW
- Meta Huntsville Data Center 13.1 km · 344 MW
- Data center in Meridianville 13.4 km · 48 MW
- Data center in Meridianville 14.2 km · 26 MW