Data Center Directory

George C. Wallace Alabama Supercomputer Center

George C. Wallace Alabama Supercomputer Center is an operational data center operated by Alabama Supercomputer Authority in Huntsville, United States. Our footprint estimate of its power is about 2.6 MW.

Key facts

StatusOperational
OperatorAlabama Supercomputer Authority
Facility power2.6 MW (range 1.3 MW to 4.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,143 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressDiscovery Drive Northwest 686, 35806, Huntsville
Coordinates34.73654, -86.67310

Power and grid

Nearest high-voltage substationUnnamed substation, 161 kV, 4 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMadison Substation, 500 kV, 15.3 km away
HV substations within 10 km8
UtilityCity Of Huntsville (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineEnbridge Pipelines (AlaTenn), interstate pipeline, 3.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5.7 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity399 g CO₂ per kWh (Alabama, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 30%, coal 15.2%, hydro 5.8%, bioenergy 2.3%. Clean power: 39.1%
Industrial power priceUSD 0.081 per kWh (Alabama, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature15.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.1 °C (2001 to 2025)
Cooling degree days1,008 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayLow - Medium (10-20%) (Alabama)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does George C. Wallace Alabama Supercomputer Center use?

We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.

How close is George C. Wallace Alabama Supercomputer Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 4 km away. The local utility is City Of Huntsville, in the TVA balancing area.

How clean is the power for George C. Wallace Alabama Supercomputer Center?

The grid in Alabama emits about 399 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 30%, coal 15.2%.

Who operates George C. Wallace Alabama Supercomputer Center?

Alabama Supercomputer Authority.