Data center in Meridianville
Data center in Meridianville is an operational data center in Meridianville, United States. Our footprint estimate of its power is about 26 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 26 MW (range 13 MW to 42 MW) Estimate from building footprint, low confidence. Footprint estimate: about 21,860 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 34.85762, -86.62217 |
Power and grid
| Nearest high-voltage substation | Gladstone Switching Station, 161 kV, 1.1 km away (Tennessee Valley Authority) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Madison Substation, 500 kV, 11.4 km away |
| HV substations within 10 km | 4 |
| Utility | City Of Huntsville (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TVA |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 9.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.6 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 399 g CO₂ per kWh (Alabama, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.6%, nuclear 30%, coal 15.2%, hydro 5.8%, bioenergy 2.3%. Clean power: 39.1% |
| Industrial power price | USD 0.081 per kWh (Alabama, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.3 °C (2001 to 2025) |
| Cooling degree days | 935 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.32 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Alabama) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Meridianville use?
We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.
How close is Data center in Meridianville to the power grid?
The nearest high-voltage substation in OpenStreetMap is Gladstone Switching Station (161 kV), about 1.1 km away. The local utility is City Of Huntsville, in the TVA balancing area.
How clean is the power for Data center in Meridianville?
The grid in Alabama emits about 399 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 30%, coal 15.2%.
Data centers near Meridianville
- Data center in Meridianville 814 m · 48 MW
- Meta Huntsville Data Center 1.1 km · 344 MW
- Meta Huntsville Data center 1.7 km · 59 MW
- Meta Huntsville Data center 2.0 km · 106 MW
- Meta Huntsville 11.1 km · 198 MW
- Simple Helix 14.0 km · 2.9 MW
- George C. Wallace Alabama Supercomputer Center 14.2 km · 2.6 MW
- DC BLOX HSV1 - DCBLOX Huntsville 17.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.