Data center in Meridianville is an operational data center in Meridianville, United States. Our footprint estimate of its power is about 48 MW.

Key facts

StatusOperational
Facility power48 MW (range 24 MW to 78 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 40,388 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 21,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates34.85108, -86.62617

Power and grid

Nearest high-voltage substationGladstone Switching Station, 161 kV, 500 m away (Tennessee Valley Authority)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMadison Substation, 500 kV, 11.3 km away
HV substations within 10 km4
UtilityCity Of Huntsville (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 9.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5.6 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity399 g CO₂ per kWh (Alabama, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 30%, coal 15.2%, hydro 5.8%, bioenergy 2.3%. Clean power: 39.1%
Industrial power priceUSD 0.081 per kWh (Alabama, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature15.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.3 °C (2001 to 2025)
Cooling degree days935 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.32 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayLow - Medium (10-20%) (Alabama)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Meridianville use?

We estimate the facility power at about 48 MW. Estimate from building footprint, low confidence.

How close is Data center in Meridianville to the power grid?

The nearest high-voltage substation in OpenStreetMap is Gladstone Switching Station (161 kV), about 500 m away. The local utility is City Of Huntsville, in the TVA balancing area.

How clean is the power for Data center in Meridianville?

The grid in Alabama emits about 399 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 30%, coal 15.2%.