Meta Huntsville
Meta Huntsville is an operational AI data center operated by Meta in AL, United States. Its power is about 198 MW. Epoch AI estimates about 167,000 H100-equivalent AI chips (B300).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Users | Meta |
| Facility power | 198 MW Reported (Epoch AI or owner data) |
| IT power | 146 MW |
| AI compute | 167,000 H100-equivalents |
| AI chips | B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 81,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 5.5 billion Epoch AI estimate, 2025 USD. |
| Energy partners | Tennessee Valley Authority, NextEra Energy Resources, First Solar |
| Address | 5400 Prosperity Dr NW, Toney, AL |
| Coordinates | 34.89814, -86.73357 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2021-12-13 | 0 | 0 | Building 1 land clearing begins. |
| 2025-03-03 | 0 | 0 | Building 2 roof starts to go on and its cooling installation is in progress. |
| 2025-11-04 | 0 | 0 | We believe Building 1 and 2 are still being finished due to continued construction vehicles and unfinished land around the data center sites. |
| 2026-02-02 | 0 | 0 | Color artifacts appear on small number of Building 1 fans. Continued presence of construction equipment and unfinished land around Building 2 suggests the final phase of construction. |
| 2026-03-04 | 105 MW | 88,000 | We estimate that Building 1 is operational 30 days after the appearance of color artifacts on the fans. |
| 2026-06-02 | 198 MW | 167,000 | We estimate Building 2 becomes operational due to being 120 days after final phases of construction, 9 months since roof and cooling were done, and similar Meta data centers construction timelines. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-02-02 | B300 | 35,002 | Estimate |
| 2026-06-02 | B300 | 66,004 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Huntsville use?
Public data puts the facility power at about 198 MW. Reported (Epoch AI or owner data).
What chips does Meta Huntsville use?
Reported chips: B300.
Who operates Meta Huntsville?
Meta. Reported users: Meta.
Data centers near AL
- Data center in Meridianville 11.1 km · 48 MW
- Data center in Meridianville 11.1 km · 26 MW
- Meta Huntsville Data center 11.3 km · 59 MW
- Meta Huntsville Data Center 11.3 km · 344 MW
- Meta Huntsville Data center 11.5 km · 106 MW
- Simple Helix 17.4 km · 2.9 MW
- George C. Wallace Alabama Supercomputer Center 18.8 km · 2.6 MW
- DC BLOX HSV1 - DCBLOX Huntsville 21.1 km
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.