Data Center Directory

NAO 5/NAO 6

NAO 5/NAO 6 is an operational data center operated by Meta in New Albany, United States. Our footprint estimate of its power is about 88 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power88 MW (range 44 MW to 140 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 73,091 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 38,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.06038, -82.75099

Power and grid

Nearest high-voltage substationBrie Substation, 138 kV, 400 m away (American Electric Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationBabbitt Substation, 345 kV, 1.7 km away
HV substations within 10 km28
UtilityLicking Rural Electric INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 6.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days504 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NAO 5/NAO 6 use?

We estimate the facility power at about 88 MW. Estimate from building footprint, low confidence.

What chips does NAO 5/NAO 6 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

How close is NAO 5/NAO 6 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Brie Substation (138 kV), about 400 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.

How clean is the power for NAO 5/NAO 6?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates NAO 5/NAO 6?

Meta.

Data centers near New Albany

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.