Meta New Albany Data Center
Meta New Albany Data Center is an operational data center operated by Meta in New Albany, United States. Our footprint estimate of its power is about 119 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 119 MW (range 48 MW to 298 MW) Estimate from building footprint, low confidence. Footprint estimate: about 993,447 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 51,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | NAO 3 |
| Coordinates | 40.06429, -82.74977 |
Power and grid
| Nearest high-voltage substation | Brie Substation, 138 kV, 800 m away (American Electric Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Babbitt Substation, 345 kV, 1.3 km away |
| HV substations within 10 km | 27 |
| Utility | Licking Rural Electric INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 532 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta New Albany Data Center use?
We estimate the facility power at about 119 MW. Estimate from building footprint, low confidence.
What chips does Meta New Albany Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How close is Meta New Albany Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Brie Substation (138 kV), about 800 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.
How clean is the power for Meta New Albany Data Center?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Meta New Albany Data Center?
Meta.
Data centers near New Albany
- NAO 5/NAO 6 448 m · 88 MW
- NAO 1/NAO 2 461 m · 120 MW
- Meta LCO 3 Project 674 m · 174 MW
- Google New Albany 737 m · 400 MW
- Quality Technology Services data center in New Albany 749 m · 27 MW
- LCO 1 844 m · 44 MW
- Quality Technology Data Center 1.2 km · 15 MW
- Data center in New Albany 1.2 km · 18 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.