Data center in New Albany is an operational data center in New Albany, United States. Our footprint estimate of its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 18 MW (range 9.1 MW to 29 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,172 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.05924, -82.76268 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 300 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Babbitt Substation, 345 kV, 2.5 km away |
| HV substations within 10 km | 29 |
| Utility | Licking Rural Electric INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 5.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 9 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in New Albany use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
How close is Data center in New Albany to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 300 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.
How clean is the power for Data center in New Albany?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Data centers near New Albany
- Google NBY-1 256 m · 27 MW
- Google New Albany Data Center 284 m · 270 MW
- Quality Technology Services data center in New Albany 592 m · 27 MW
- Google NBY-7 599 m · 29 MW
- Quality Technology Data Center 694 m · 15 MW
- Google NBY-6 721 m · 31 MW
- Google NBY-4 772 m · 31 MW
- Google NBY-5 850 m · 31 MW
Sources