Quality Technology Data Center
Quality Technology Data Center is an operational data center operated by Quality Technology Services in New Albany, United States. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Quality Technology Services |
| Facility power | 15 MW (range 6.1 MW to 38 MW) Estimate from building footprint, low confidence. Footprint estimate: about 127,402 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | QTS NAL 2 DC1 · QTS NAL 2 DC2 |
| Opened | 2024-09-01 |
| Coordinates | 40.05475, -82.75701 |
Power and grid
| Nearest high-voltage substation | QTS NAL-2 Substation, 138 kV, 300 m away (Quality Technology Services) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Babbitt Substation, 345 kV, 2.5 km away |
| HV substations within 10 km | 29 |
| Utility | Licking Rural Electric INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 6.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 9 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Quality Technology Data Center use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
How close is Quality Technology Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is QTS NAL-2 Substation (138 kV), about 300 m away. The local utility is Licking Rural Electric INC, in the PJM balancing area.
How clean is the power for Quality Technology Data Center?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Quality Technology Data Center?
Quality Technology Services.
Data centers near New Albany
- Google NBY-7 595 m · 29 MW
- Data center in New Albany 694 m · 18 MW
- NAO 5/NAO 6 809 m · 88 MW
- Google New Albany Data Center 833 m · 270 MW
- Google NBY-6 905 m · 31 MW
- Google NBY-1 947 m · 27 MW
- Quality Technology Services data center in New Albany 982 m · 27 MW
- Meta New Albany Data Center 1.2 km · 119 MW
More Quality Technology Services data centers
- QTS Richmond 1 United States
- QTS Piscataway Data Center United States
- QTS Richmond 2 Data Center United States
- QTS Richmond 3 Data Center United States
- QTS Ashburn 1 DC1 United States
- DC5 United States
- QTS United States
- QTS Ashburn-Shellhorn United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.