QTS Richmond 2 Data Center
QTS Richmond 2 Data Center is a data center under construction operated by Quality Technology Services in Sandston, United States. Our footprint estimate of its power is about 86 MW.
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Quality Technology Services |
| Facility power | 86 MW (range 35 MW to 216 MW) Estimate from building footprint, low confidence. Footprint estimate: about 719,231 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 37,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | RIC2 DC6 · RIC2 DC3 · RIC2 DC5 |
| Coordinates | 37.48526, -77.24268 |
Power and grid
| Nearest high-voltage substation | Techpark Place Substation, 230 kV, 400 m away (Dominion Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Virginia Natural Gas Co, intrastate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.7 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 940 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.31 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS Richmond 2 Data Center use?
We estimate the facility power at about 86 MW. Estimate from building footprint, low confidence.
How close is QTS Richmond 2 Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Techpark Place Substation (230 kV), about 400 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for QTS Richmond 2 Data Center?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates QTS Richmond 2 Data Center?
Quality Technology Services.
Data centers near Sandston
- RIC2 DC2 253 m · 50 MW
- QTS Richmond (RIC1) 340 m
- RIC1 DC3 346 m
- Meta Research SuperCluster (RSC-1) 495 m · 13 MW
- DC5 570 m · 57 MW
- QTS Richmond 1 581 m · 333 MW
- Meta Henrico Data Center 872 m · 34 MW
- Meta data center in Sandston 1.0 km · 12 MW
More Quality Technology Services data centers
- QTS Richmond 1 United States
- QTS Piscataway Data Center United States
- QTS Richmond 3 Data Center United States
- QTS Ashburn 1 DC1 United States
- DC5 United States
- QTS United States
- QTS Ashburn-Shellhorn United States
- RIC3 DC5 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.