RIC3 DC5
RIC3 DC5 is a data center under construction operated by Quality Technology Services in Sandston, United States. Our footprint estimate of its power is about 54 MW.
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Quality Technology Services |
| Facility power | 54 MW (range 27 MW to 86 MW) Estimate from building footprint, low confidence. Footprint estimate: about 44,737 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 23,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | RIC3 DC4 |
| Address | Portugee Road 3543, 23150, Sandston |
| Coordinates | 37.47702, -77.24969 |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Virginia Natural Gas Co, intrastate pipeline, 2.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 940 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.31 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does RIC3 DC5 use?
We estimate the facility power at about 54 MW. Estimate from building footprint, low confidence.
How clean is the power for RIC3 DC5?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates RIC3 DC5?
Quality Technology Services.
Data centers near Sandston
- QTS Richmond 3 Data Center 311 m · 76 MW
- DC5 865 m · 57 MW
- Meta data center in Sandston 896 m · 12 MW
- QTS Richmond 2 Data Center 1.1 km · 86 MW
- RIC1 DC3 1.3 km
- QTS Richmond (RIC1) 1.3 km
- QTS Richmond 1 1.3 km · 333 MW
- RIC2 DC2 1.4 km · 50 MW
More Quality Technology Services data centers
- QTS Richmond 1 United States
- QTS Piscataway Data Center United States
- QTS Richmond 2 Data Center United States
- QTS Richmond 3 Data Center United States
- QTS Ashburn 1 DC1 United States
- DC5 United States
- QTS United States
- QTS Ashburn-Shellhorn United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.