RIC2 DC2

RIC2 DC2 is an operational data center in Sandston, United States. Our footprint estimate of its power is about 50 MW.

Key facts

StatusOperational
Facility power50 MW (range 25 MW to 81 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 42,078 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 21,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asRIC2 DC1
AddressTechnology Boulevard 6040, 23150, Sandston
Coordinates37.48709, -77.24098

Power and grid

UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineVirginia Natural Gas Co, intrastate pipeline, 1.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days940 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.31 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does RIC2 DC2 use?

We estimate the facility power at about 50 MW. Estimate from building footprint, low confidence.

How clean is the power for RIC2 DC2?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Data centers near Sandston