Meta Henrico Data Center
Meta Henrico Data Center is an operational data center operated by Meta in Sandston, United States. Our footprint estimate of its power is about 34 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 34 MW (range 17 MW to 55 MW) Estimate from building footprint, low confidence. Footprint estimate: about 28,522 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 37.48195, -77.23371 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 500 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Virginia Natural Gas Co, intrastate pipeline, 1.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.7 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 940 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.31 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Henrico Data Center use?
We estimate the facility power at about 34 MW. Estimate from building footprint, low confidence.
What chips does Meta Henrico Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How close is Meta Henrico Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 500 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Meta Henrico Data Center?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Meta Henrico Data Center?
Meta.
Data centers near Sandston
- Meta Research SuperCluster (RSC-1) 400 m · 13 MW
- Meta data center in Sandston 753 m · 38 MW
- Meta data center in Sandston 788 m · 12 MW
- RIC2 DC2 859 m · 50 MW
- QTS Richmond 2 Data Center 872 m · 86 MW
- QTS Richmond (RIC1) 1.1 km
- RIC1 DC3 1.2 km
- DC5 1.4 km · 57 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.