Meta data center in Sandston
Meta data center in Sandston is an operational data center operated by Meta in Sandston, United States. Our footprint estimate of its power is about 12 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 12 MW (range 4.8 MW to 30 MW) Estimate from building footprint, low confidence. Footprint estimate: about 100,122 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 37.47660, -77.23955 |
Power and grid
| Nearest high-voltage substation | Elko Substation, 230 kV, 200 m away (Virginia Electric and Power Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Virginia Natural Gas Co, intrastate pipeline, 2.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.7 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 940 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.31 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta data center in Sandston use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
What chips does Meta data center in Sandston use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How close is Meta data center in Sandston to the power grid?
The nearest high-voltage substation in OpenStreetMap is Elko Substation (230 kV), about 200 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Meta data center in Sandston?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Meta data center in Sandston?
Meta.
Data centers near Sandston
- Meta Henrico Data Center 788 m · 34 MW
- Meta Research SuperCluster (RSC-1) 874 m · 13 MW
- RIC3 DC5 896 m · 54 MW
- QTS Richmond 2 Data Center 1.0 km · 86 MW
- QTS Richmond 3 Data Center 1.1 km · 76 MW
- Meta data center in Sandston 1.1 km · 38 MW
- RIC2 DC2 1.2 km · 50 MW
- DC5 1.2 km · 57 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.