QTS

QTS is an operational data center operated by Quality Technology Services in Fayetteville, United States. Our footprint estimate of its power is about 57 MW.

Key facts

StatusOperational
OperatorQuality Technology Services
Facility power57 MW (range 29 MW to 91 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 47,602 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 24,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.46229, -84.52368

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 1.5 km away (Georgia Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km10
UtilityCoweta-Fayette El Member Corp (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 2.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km7.6 GW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.4 °C (2001 to 2025)
Cooling degree days1,093 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.51 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does QTS use?

We estimate the facility power at about 57 MW. Estimate from building footprint, low confidence.

How close is QTS to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1.5 km away. The local utility is Coweta-Fayette El Member Corp, in the SOCO balancing area.

How clean is the power for QTS?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates QTS?

Quality Technology Services.

Data centers near Fayetteville

More Quality Technology Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.