Digital Realty Data Center
Digital Realty Data Center is an operational data center operated by Digital Realty in Atlanta, United States. Our footprint estimate of its power is about 23 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Realty |
| Facility power | 23 MW (range 12 MW to 37 MW) Estimate from building footprint, low confidence. Footprint estimate: about 19,170 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Doug Davis Drive 760, 30354, Atlanta |
| Coordinates | 33.65701, -84.41522 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 900 m away (Georgia Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | East Point Primary Substation, 230 kV, 4.9 km away |
| HV substations within 10 km | 33 |
| Utility | Georgia Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 6.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.7 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.4 °C (2001 to 2025) |
| Cooling degree days | 1,093 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.51 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Digital Realty Data Center use?
We estimate the facility power at about 23 MW. Estimate from building footprint, low confidence.
How close is Digital Realty Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 900 m away. The local utility is Georgia Power Co, in the SOCO balancing area.
How clean is the power for Digital Realty Data Center?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates Digital Realty Data Center?
Digital Realty.
Data centers near Atlanta
- Cogent Atlanta 2 7.3 km
- Verizon Atlanta 7.9 km
- EdgeConneX Atlanta (EDCATL01) 8.1 km
- EdgeConneX Atlanta (EDCATL02) 8.4 km
- DataBank Atlanta (ATL2) 8.6 km
- Microsoft East Point Datacenter Campus 9.6 km · 36 MW
- Colo@34 (Downtown) 11.1 km
- Equinix AT2/AT3 - Atlanta 11.2 km
More Digital Realty data centers
- Digital Realty CH1 - Chicago United States
- Digital Realty IAD39 United States
- Digital Realty IAD51 United States
- Digital Realty IAD44 United States
- Digital Realty IAD41 United States
- Digital Realty Singapore SIN11 Singapore
- Digital Realty Toronto YYZ11 Canada
- Digital Realty IAD43 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.