Data Center Directory

Digital Realty IAD43

Digital Realty IAD43 is an operational data center operated by Digital Realty in Sterling, United States. Its power is about 65 MW.

Key facts

StatusOperational
OperatorDigital Realty
Facility power65 MW
Derived from a tagged IT power value. IT power tag in OpenStreetMap
IT power50 MW
GPU capacity if all AIabout 28,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressPrentice Drive 44820, 20166, Sterling
Coordinates39.00183, -77.45270

Power and grid

Nearest high-voltage substationLockridge Substation, 230 kV, 600 m away (Virginia Electric & Power Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km53
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 1.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.6 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Digital Realty IAD43 use?

Public data puts the facility power at about 65 MW. Derived from a tagged IT power value.

How close is Digital Realty IAD43 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Lockridge Substation (230 kV), about 600 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for Digital Realty IAD43?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates Digital Realty IAD43?

Digital Realty.

Data centers near Sterling

More Digital Realty data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.