PowerHouse Pacific Building 3
PowerHouse Pacific Building 3 is a data center under construction in Sterling, United States. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 14 MW (range 7.2 MW to 23 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,044 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Power Player Lane 22214, 20166, Sterling |
| Coordinates | 39.00359, -77.44677 |
Power and grid
| Nearest high-voltage substation | Buttermilk Substation, 230 kV, 1 km away (Dominion Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 48 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does PowerHouse Pacific Building 3 use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How close is PowerHouse Pacific Building 3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Buttermilk Substation (230 kV), about 1 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for PowerHouse Pacific Building 3?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Data centers near Sterling
- PowerHouse Pacific Building 2 156 m · 15 MW
- PowerHouse Pacific Building 1 186 m · 15 MW
- Digital Realty IAD42 329 m · 62 MW
- QTS Ashburn (ASH1) 399 m · 4.4 MW
- STACK NVA01A 452 m · 22 MW
- QTS Ashburn 1 DC1 536 m · 72 MW
- Digital Realty IAD43 549 m · 65 MW
- Vantage VA13 572 m · 21 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.