Vantage VA13
Vantage VA13 is an operational data center operated by Vantage Data Centers in Sterling, United States. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vantage Data Centers |
| Facility power | 21 MW (range 10 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,137 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Vantage VA14 · Vantage VA11 · Vantage VA12 |
| Address | Vantage Data Plaza 45070, 20166, Sterling |
| Coordinates | 39.00321, -77.44018 |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vantage VA13 use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
How clean is the power for Vantage VA13?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Vantage VA13?
Vantage Data Centers.
Data centers near Sterling
- STACK NVA01A 213 m · 22 MW
- Sentinel Cloud Plaza 287 m · 37 MW
- Vantage VA15 412 m · 3.5 MW
- Vantage VA16 454 m · 6.7 MW
- PowerHouse Pacific Building 3 572 m · 14 MW
- PowerHouse Pacific Building 1 586 m · 15 MW
- VeriSign Incorporated 683 m · 23 MW
- PowerHouse Pacific Building 2 727 m · 15 MW
More Vantage Data Centers data centers
- Vantage TX1 United States
- Vantage VA2 United States
- Vantage Data Center FRA21 Germany
- Vantage VA3 United States
- Vantage San Antonio II United States
- Vantage Data Centers - CWL1 United Kingdom
- Vantage Data Centers AZ1 Campus United States
- Vantage Santa Clara CA2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.