Vantage TX1
Vantage TX1 is an operational data center that is still expanding, operated by Vantage Data Centers in San Antonio, United States. Its power is about 45 MW, growing to about 179 MW by 2027-08. Epoch AI estimates about 39,000 H100-equivalent AI chips (B200).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Vantage Data Centers |
| Facility power | 45 MW Reported (Epoch AI or owner data) |
| IT power | 32 MW |
| Planned power | 179 MW by 2027-08-31 Epoch AI timeline projection. |
| AI compute | 39,000 H100-equivalents → 155,000 planned |
| AI chips | B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 18,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 1.2 billion → 4.8 billion planned Epoch AI estimate, 2025 USD. |
| Also known as | Vantage San Antonio I · Vantage TX12 · Vantage TX11 |
| Address | 14720 Omicron Dr, San Antonio, TX 78245 |
| Coordinates | 29.41686, -98.79019 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 400 m away (CPS Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 7 km away |
| HV substations within 10 km | 5 |
| Utility | Bandera Electric Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | El Paso Texas Pipeline Co, intrastate pipeline, 6.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.2 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.5 °C (2001 to 2025) |
| Cooling degree days | 1,804 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.84 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-12-15 | 0 | 0 | Land clearing begins for both Building 1 & Building 2 |
| 2026-02-15 | 45 MW | 39,000 | Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, based on the appearance, we believe it is operational. Reported IT power of 32 MW. [Source](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024007561) |
| 2027-08-31 (projected) | 179 MW | 155,000 | Estimated construction completion date of Building 2. [Construction Project Filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026001234) |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-02-15 | B200 | 15,311 | Estimate |
| 2027-08-31 | B200 | 61,244 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vantage TX1 use?
Public data puts the facility power at about 45 MW, with about 179 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does Vantage TX1 use?
Reported chips: B200.
How close is Vantage TX1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 400 m away. The local utility is Bandera Electric Coop, INC, in the ERCO balancing area.
How clean is the power for Vantage TX1?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Vantage TX1?
Vantage Data Centers.
Data centers near San Antonio
- CyrusOne SAT10 & SAT11 274 m · 12 MW
- Data center in Lackland Air Force Base 383 m · 21 MW
- Microsoft 1.3 km · 31 MW
- Microsoft Texas Research Park Campus 1.3 km · 87 MW
- Microsoft TRP1 1.3 km · 15 MW
- Microsoft TRP3 (SAT46) 1.6 km · 19 MW
- Data center in Leon Valley 8.2 km · 14 MW
- Data center in Leon Valley 8.4 km · 14 MW
More Vantage Data Centers data centers
- Vantage VA2 United States
- Vantage Data Center FRA21 Germany
- Vantage VA3 United States
- Vantage VA13 United States
- Vantage San Antonio II United States
- Vantage Data Centers - CWL1 United Kingdom
- Vantage Data Centers AZ1 Campus United States
- Vantage Santa Clara CA2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.