Data Center Directory

Vantage VA2

Vantage VA2 is an operational data center operated by Vantage Data Centers in Sterling, United States. Its power is about 125 MW.

Key facts

StatusOperational
OperatorVantage Data Centers
Facility power125 MW
Derived from a tagged IT power value. IT power tag in OpenStreetMap
IT power96 MW
GPU capacity if all AIabout 53,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressGlenn Drive 22435, 20164, Sterling
Coordinates38.99795, -77.43023
Websitevantage-dc.com/data-center-locations/north-america/ashburn-ii-virginia

Power and grid

UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 1.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Vantage VA2 use?

Public data puts the facility power at about 125 MW. Derived from a tagged IT power value.

How clean is the power for Vantage VA2?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates Vantage VA2?

Vantage Data Centers.

Data centers near Sterling

More Vantage Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.