Key facts

StatusOperational
OperatorVantage Data Centers
Facility power17 MW (range 6.9 MW to 43 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 144,777 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asCenterprise International Newport
AddressNP10 8BE, Newport
Coordinates51.55610, -3.03655
Websitevantage-dc-cardiff.co.uk

Power and grid

Nearest high-voltage substationImperial Park Substation, 400 kV, 1 km away (National Grid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km13
Power plants within 50 km3.8 GW in 137 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.8 °C (2001 to 2025)
Cooling degree days12 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.4 m/s average
Water stress todayLow (<10%) (Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Vantage Data Centers - CWL1 use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

How close is Vantage Data Centers - CWL1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Imperial Park Substation (400 kV), about 1 km away.

How clean is the power for Vantage Data Centers - CWL1?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Vantage Data Centers - CWL1?

Vantage Data Centers.

Data centers near Newport

More Vantage Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.